English-Style Coffee Table: Printable Woodworking Project Plan

Original price was: $10.00.Current price is: $6.67.

In stock

Quantity
SKU: 151618 Category: Brand:

Description

You can create this 18″ deep, 42″ wide plank top table with pierced and vase shaped end boards. The stretchers are connected by wedged trusses. The antiquated 17th century design is 16″ high and should be made of oak, walnut, or pine. It is very easy for the beginner to build.All joinery is shown in actual size and curved workpieces are all in full size. You can measure and trace straight from the drawing. A bill of materials doubles as an exact cutting list plus there is a detailed exploded diagram. All hardware requirements are provided. The exploded diagram is so detailed that project specific assembly instructions are not provided.