Description
An unusual Spanish hall table with attractive geometric carving on the drawer front (for which a full size pattern is provided). Use this piece with a mirror to enhance the appearance of your hall or living room area. The full-size templates make it easy to cut the distinctive profile of the legs and stretcher, giving you a graceful, and historically accurate piece.
All joinery is shown in actual size, curved workpieces are all in full size and you can measure and trace straight from the drawing. A bill of materials doubles as an exact cutting list, there is a detailed exploded diagram, and all hardware requirements are provided.
NOTE: The exploded diagram is so detailed that project specific assembly instructions are not provided.
Overall size: 13-1/2″ D x 37-3/4″ W x 30″ high.




Reviews
There are no reviews yet.