Description
Create this interestingly proportioned Bachelor’s Chest designed after an English (or American Chippendale) chest of drawers. Features symmetrical, graduated drawers a full width drawboard or slide for use as a dressing stand, and small overall size. This Interesting and useful project is historically accurate.
All joinery is shown in actual size while curved workpieces are all in full size. You can measure and trace straight from the drawing. Also includes bill of materials/cutting list, detailed exploded diagram, and all hardware requirements list.
NOTE: The exploded diagram is so detailed that project specific assembly instructions are not provided.
Overall size:17-3/8″ D x 29-3/4″ W x 29-3/4″ H




Reviews
There are no reviews yet.