Build this distinctive corner cabinet as two separate units to create a beautiful display space. It’s ample size gives you plenty of storage and display area while becoming an architectural feature of your room.

All joinery is shown in actual size, curved workpieces are all in full size and you can measure and trace straight from the drawing. Also includes bill of materials/cutting list, detailed exploded diagram, and hardware requirements list.

NOTE: The exploded diagram is so detailed that project specific assembly instructions are not provided.

Size: 40-7/8″ W (face) x 84-3/16″ H